Myles Standish Hall – Construction Update – 8/3/18

Myles Standish Hall - Construction Update - 8/3/18

For 8/4/18 to 8/10/18:

Deliveries

  • Subcontractors will receive deliveries all week between 7 am and 6 pm on both Beacon Street and Bay State Road

On-site Construction

Saturday Work – 8/4/18 – 7 am to 5 pm

  • Clean up and load out
  • Interior Work – Myles
  • Annex interior framing and MEP roughs
  • Annex exterior façade work
  • Annex install pavers

Myles – 7 am to 6 pm

Load out

  • Load out at Beacon Street and Bay State Road – Load out debris from 1st floor to dumpsters with ongoing daily dumpster swaps

Site

  • Myles
    • Beacon Street – Continue with cut and caps
  •  Bay State Road,  Beacon Street, and Raleigh Street
    • Continue with installation of pavers and landscape

Annex – 7 am to 6 pm

Load out

  • Load out at Bay State Road and Beacon Street to dumpsters with ongoing daily dumpster swaps

Masonry Restoration

  • Beacon Street, Raleigh Street, and Bay State Road continue with façade restoration