Geothermal Well Drilling Initiative – Construction Update – 7/12/19

During the week of July 15th

Parking Lot N

  • Construction equipment will be making multiple trips from the alley to the parking lot N storage area.
  • The site contractor will continue the tree removal operation in the parking lot.

Alleyway

  • The drilling subcontractor will begin drilling to bedrock and setting casing at geothermal well locations within the alley.
  • The site contractor will continue the tree removal operation in the alley.

Park

  • The high performance geothermal exchange piping is anticipated to be delivered to the site and stockpiled in the park.
  • To access material stockpiled in the park, construction equipment will be making multiple trips to this site.
  • The site contractor will continue the tree removal operation in the park.

As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered. Your safety is imperative!

Drilling to bedrock and setting casing at geothermal well location GT-9
Drilling to bedrock and setting casing at geothermal well location GT-9
Drill rig was mobilized
Mobilized drill rig on site