Geothermal Well Drilling Initiative – Construction Update – 7/12/19
During the week of July 15th
Parking Lot N
- Construction equipment will be making multiple trips from the alley to the parking lot N storage area.
- The site contractor will continue the tree removal operation in the parking lot.
Alleyway
- The drilling subcontractor will begin drilling to bedrock and setting casing at geothermal well locations within the alley.
- The site contractor will continue the tree removal operation in the alley.
Park
- The high performance geothermal exchange piping is anticipated to be delivered to the site and stockpiled in the park.
- To access material stockpiled in the park, construction equipment will be making multiple trips to this site.
- The site contractor will continue the tree removal operation in the park.
As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered. Your safety is imperative!