Geothermal Well Drilling Initiative – Construction Update – 2/7/20
During the week of February 10th :
Parking Lot N
- No geothermal work is scheduled.
Alleyway
- The drilling subcontractor will be pressure testing the piping within the completed borehole at GT-11 at the east end of the alley.
Park
- No geothermal work is scheduled.
As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered at both the interior and exterior of the building. Your safety is imperative!