West Campus Dining Expansion – Construction Update – 04/21/23
Weekend of April 22nd
- There will be contractors working on the ceiling in the vicinity of the security desk and the surrounding lobby area.
Week of April 17th
- Inside, sheetrock, acoustic ceiling tile grid, ductwork insulation, and flooring are being installed. The team will also be installing the acoustic ceiling tile grid and continuing with wall painting.
- Outside, masonry repairs will be taking place around the canopy.
- Metal decking will be installed on the canopy. Boston Fire Department will be on site for this work.
- Ceiling framing and roofing installation will begin at the canopy.
- Temporary toilets will be cleaned Wednesday, April 26.
- Ceiling material will be delivered to the site Monday, April 24.