Weekend of April 22nd

  • There will be contractors working on the ceiling in the vicinity of the security desk and the surrounding lobby area.

Week of April 17th

  • Inside, sheetrock, acoustic ceiling tile grid, ductwork insulation, and flooring are being installed. The team will also be installing the acoustic ceiling tile grid and continuing with wall painting.
  • Outside, masonry repairs will be taking place around the canopy.
  • Metal decking will be installed on the canopy. Boston Fire Department will be on site for this work.
  • Ceiling framing and roofing installation will begin at the canopy.
  • Temporary toilets will be cleaned Wednesday, April 26.
  • Ceiling material will be delivered to the site Monday, April 24.