West Campus Dining Expansion – Construction Update – 07/21/23

General Project Updates

  • Last week work on the new exterior walkway continued.
  • Framing of the gluten-free area was completed.
  • Preparation for the concrete pour for the floor in the back-of-house kitchen was completed.
  • Lighting installation continued.
  • Work to eliminate the existing entrance continued.

Week of July 24th

  • Pavers will be installed on the new exterior walkway.
  • Floor preparation continues in the main dining hall.
  • Work to prepare for the delivery of millwork and equipment throughout the main dining hall continues.
  • Concrete flooring will be poured in the back-of-house kitchen.
  • Ongoing work on walls, floors, and ceilings throughout.
  • Completion of punchlist items for the Residence Life offices.
  • Beginning work in the basement for additional Residence Life spaces.