West Campus Dining Expansion – Construction Update – 07/21/23
General Project Updates
- Last week work on the new exterior walkway continued.
- Framing of the gluten-free area was completed.
- Preparation for the concrete pour for the floor in the back-of-house kitchen was completed.
- Lighting installation continued.
- Work to eliminate the existing entrance continued.
Week of July 24th
- Pavers will be installed on the new exterior walkway.
- Floor preparation continues in the main dining hall.
- Work to prepare for the delivery of millwork and equipment throughout the main dining hall continues.
- Concrete flooring will be poured in the back-of-house kitchen.
- Ongoing work on walls, floors, and ceilings throughout.
- Completion of punchlist items for the Residence Life offices.
- Beginning work in the basement for additional Residence Life spaces.